ConnectRE constituency code to/from date changes

The constituency codes in Core that are brought into RE through connectRE, should be brought over as the correct "to"/"from" dates. Ex: the day the constituent became a Parent until their child graduated. Currently, the dates are brought over as the date connectRE was USED to transfer data. Thus, the constituency dates in Core and RE do not match.

  • Guest
  • Jan 6 2020
  • Attach files